The new
Mediterranean gateway
A strategic landing alternative connecting Iberia with Asia,
the Middle East, Africa, and Europe
A fully neutral, scalable infrastructure designed for Barracuda and up to three additional
submarine cable systems
A high availability data center ready for colocation or any other service requiring
the best international connectivity
A strategic landing alternative connecting Iberia with Asia, the Middle East, Africa, and Europe
A fully neutral, scalable infrastructure designed for Barracuda and up to three additional submarine cable systems
A high availability data center ready for colocation or any other service requiring
the best international connectivity
Benefits
- 3.800m2 plot located in Sagunto (Valencia, Spain)
- 4.800m2 of usable area distributed in 2 floors
- 4 submarine cable landing rooms
- 4 colocation rooms
- 2 meet-me rooms
- 10 Mw peak power consumption
- 300 Kw photovoltaic plant on the building roof
- 100% renewable energy
- Design according to EN50600 European Standard
- Availability class 4
- Security class 4
- Energy efficiency enablement class 3
Carrier-Neutral Data Center building with high capacity and high quality international interconnection through diverse fibre routes, both submarine and terrestrial
To provide the best experiences, we use technologies such as cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent may adversely affect certain features and functions.