INFRASTRUCTURE

An open cable connecting Spain with Italy

  • First high-capacity submarine direct route between Spain and Italy

  • Minimum latency route for crossing the Iberian peninsula from the Mediterranean to the Atlantic

  • Facilitating connectivity with FLAPD, Middle East and Asia through Genoa, the most rapid growing subsea landing point in Europe
  • Diverse route to terrestrial alternatives

OPEN CABLE

32 Tb/s
CAPACITY PER FIBRE

1060 km subsea
cable length

SMART CABLE

12 FIBRE PAIR

POPS LOCATED IN THE MAIN DATA CENTERS
- SPAIN (MADRID, VALENCIA)
- ITALY (GENOA, MILAN)
- PORTUGAL (LISBOn)

Mediterranean high availability subsea cable to diversify increasing traffic flows

  • Shortest terrestrial route from the Mediterranean to reach the Americas and Africa
  • Complementary wet route to Iberian U
  • Lowest latency subsea route between FLAPD and the Italian hub
data center